




With BGA Realism, your FS25 biogas plants work like real facilities with process biology behind them. You are not just choosing fixed recipes. Substrates break down inside the digester for around 45 days and produce methane, while temperature, fill level, stirring and the substrate mixture affect the gas generation. That gives you more to manage while you build and run the plant.
Features
- Open the custom dashboard with Ctrl + B or ESC → Productions. It gives you the overview of digesters, tanks, gas/CHP, agitator, digestate, analysis and settings
- Start the facility by commissioning it with 500 m³ of starter digestate
- Use the input bunker for dosage, with slurry going directly into the digester
- Run agitators in digesters, secondary digesters and storage tanks either automatically or manually
- Move digestate through the cascade, digester → secondary digester → storage tank, or choose manual pumping routes
- Store gas, adjust the CHP unit output and use the gas flare for surplus gas
- Sell electricity and heat, with own consumption deducted. Grid electricity and external heat are billed monthly
- Check digestate in the laboratory, including N/P/K, and transfer the analysis to Precision Farming
- Edit fill levels and the substrate mixture in the savegame file
bgaRealism.xml - Find image-based in-game help under ESC → Help
- Multiplayer-compatible
- Watch the process biology work over around 45 days, with methane production based on temperature, fill level, stirring and substrate mixture
Specifications
- Four base-game biogas plants come as complete facilities: 99 kW, 250 kW, 500 kW and 1 MW
- The tank capacities come from measurements of the models
Compatible with:
- Pumps N’ Hoses Pack (DLC): modular facilities with digester, secondary digester, storage tank, V-BIO/DOB bunker, 2G CHP unit and gas flare
- FS25_AdvancedSilageTypes: maize, grass, clover and alfalfa silage tracked separately
- FS25_MediumBiogasPlantPackage: 400 kW and 750 kW biogas plants as complete facilities
- FS25_BGA_Construction_Kit: bunker facilities from 150 kW to 1.5 MW as complete facilities
- Precision Farming: nitrogen value from the laboratory analysis
Changelog
- V1.2.0.0
Slurry Separator (Pumps N’ Hoses): The stationary separators, including tower, box and shed, are now integrated. The thin phase is returned to the digester, while the solid phase ends up in a pile beneath the separator and can be picked up with a bucket. If a trailer is positioned directly under the pipe, it will be filled instead. Set the quantity per day and Automatic/Off via the dashboard, R at the wrench. The overview map shows the separator and the slurry route.
English help graphics: When the game language is set to English, the images in the help section are now also displayed in English. - V1.1.0.0
The four BGA lines in the financial overview were displayed as “Missing ‘finance_bgaRealism…’ in l10n_de.xml” instead of their names. They now show the correct names: BGA electricity sales, BGA heat sales, BGA grid electricity purchase and BGA external heat purchase. - V1.0.0.0
The dashboard now has a dark control room design on all pages. In the overview, you can see a live flow diagram showing bunker → fermenter → post-digester → storage, plus the gas storage, CHP unit and flare.
There are also new pages for Biology with traffic-light scales, Gas & Energy with a 24-hour history and marked feeding times, Agitator with an agitation schedule, Digestate with a 14-day forecast for the storage, and Feeding with a what-if calculator.
A message bar lets you know, for example, when storage is almost full, the bunker is empty or the gas storage is nearly full.
Feeding: The bunker contents and consumption period are used to calculate the amount automatically. Manual feeding lets you add up to 8 t at once. After that, the plant goes back to automatic mode and dispenses only half as much for 2 hours. CCM, corn meal, grain meal and protein meal from the CCM Production Pack can be used as substrates.
Gas Production: Substrates now have a fast fraction and a slow fraction. Once you feed them, gas production goes up immediately and then gradually decreases.
Tanks & Pumps: Use the pumping diagram for manual pumping with a specified quantity, independently of the 95% cascade. Recirculation adds the route post-digester → fermenter. The fermenter always keeps 500 m³ of inoculant material. Multiple tanks of the same type are combined and displayed individually. Tanks built later are detected. You can set the agitation interval and duration separately for every tank.
Precision Farming: Each plant gets its own laboratory analysis. Every tanker remembers the plant where it was filled. The PF display and fertilization use that plant’s nitrogen value. If one tanker contains digestate from multiple plants, the values are averaged by quantity. With several tankers working at the same time, each one calculates with its own value.





