





BGA Realism lets you run the biogas plants in FS25 as real facilities with process biology behind them. There are no fixed recipes here. Your substrates break down in the digester over around 45 days and produce methane, and gas production depends on temperature, fill level, stirring and the substrate mixture. It gives you more to keep an eye on while you use and build with the plants.
Features
- Open the custom dashboard with
Ctrl + BorESC → Productionsto check the overview, digesters, tanks, gas/CHP, stirrer, digestate, analysis and settings - Get commissioning started with 500 m³ of starter digestate
- Use the feed bunker for dosing, while slurry goes straight into the digester
- Run the stirrers in digesters, post-digesters and storage tanks automatically or manually
- Follow the digestate cascade from digester to post-digester to storage tank, or use manual pumping routes
- Store gas, set the CHP output, and use the gas flare for surplus gas
- Sell electricity and heat with own consumption deducted. Grid electricity and external heat are billed monthly
- Check digestate in the laboratory for N/P/K and transfer the analysis to Precision Farming
- Use the base-game biogas plants as complete facilities in 99 kW, 250 kW, 500 kW and 1 MW capacities. Tank capacities are measured from the models
- Edit fill levels and the substrate mixture in the savegame file
bgaRealism.xml - Find image-based in-game help under
ESC → Help - Multiplayer compatible
Specifications
- Base-game biogas plant capacities: 99 kW, 250 kW, 500 kW and 1 MW
- Substrate breakdown time: around 45 days
- Starter digestate for commissioning: 500 m³
Compatible with:
- Pumps N’ Hoses Pack (DLC): modular facilities with digester, post-digester, storage tank, V-BIO/DOB bunker, 2G CHP and gas flare
- FS25_AdvancedSilageTypes: corn, grass, clover and alfalfa silage handled separately
- FS25_RealSilage: spoiled silage as a substrate, only together with AdvancedSilageTypes
- FS25_MediumBiogasPlantPackage: 400 kW and 750 kW biogas plants as complete facilities
- FS25_BGA_Construction_Kit: bunker facilities from 150 kW to 1.5 MW as complete facilities
- FS25_ProductionControl: automatically ignored at biogas plants
- Precision Farming: nitrogen value from the laboratory analysis





